Renovation Builders in Wellington
Wellington region · 15 builders listed
15 Renovation Builders in Wellington
Tom Wilson Builders Ltd
Tom Wilson Builders Ltd
5 reviews
Fix All Construction
Fix All Construction
5 reviews
Built Construction Group Limited
Built Construction Group Limited
5 reviews
Smartway Builders
Smartway Builders
5 reviews
Wellington Builders Ltd
Wellington Builders Ltd
1 reviews
Upgrades Building - Wellington Builder
Upgrades Building - Wellington Builder
5 reviews
Fair & Square Building Services Limited
Fair & Square Building Services Limited
5 reviews
Classic Builders Wellington
Classic Builders Wellington
5 reviews
Lead Builders Ltd
Lead Builders Ltd
1 reviews
Cremer Construction
Cremer Construction
5 reviews
Design Builders Wellington
Design Builders Wellington
1 reviews
Class-E-Build
Class-E-Build
1 reviews
Supreme Residential Construction
Supreme Residential Construction
3 reviews
Signature Homes Greater Wellington
Signature Homes Greater Wellington
5 reviews
EBUILD LTD
EBUILD LTD
5 reviews
Looking for a renovation builder in Wellington? Whether you are planning a kitchen remodel, bathroom renovation, or full home alteration, finding the right builder is critical. Our listed renovation builders in Wellington have experience with residential renovations of all sizes.
Renovation Costs in New Zealand
Renovation costs in New Zealand typically range from $1,500 to $3,500 per square metre, depending on the scope and quality of finishes. A basic kitchen renovation costs $20,000 to $40,000, while a mid-range full kitchen remodel runs $40,000 to $70,000. Bathroom renovations range from $15,000 to $40,000 for a standard bathroom. Whole-home renovations can cost $200,000 or more for a major transformation. These figures include labour, materials, and GST but exclude building consent fees.
Do You Need a Building Consent for Renovations?
In New Zealand, you need a building consent for most renovation work that involves structural changes (removing or altering load-bearing walls), changes to the building envelope (weathertightness), plumbing, drainage, or gas fitting, fire safety systems, and any work that affects the structural integrity of the building. Cosmetic changes like painting, replacing flooring, or updating fixtures generally do not need consent. Under the Building Act 2004, restricted building work must be carried out or supervised by a Licensed Building Practitioner (LBP).
Choosing a Renovation Builder in Wellington
Renovation work requires different skills than new builds. Look for builders with specific renovation experience, as they will be familiar with working in occupied homes, dealing with unexpected issues in existing structures, and managing the complexities of matching new work to old. Check that your builder is a Licensed Building Practitioner (LBP) on the Building Performance website. Get at least three detailed written quotes. Ask for examples of completed renovation projects similar to yours. Confirm they hold public liability insurance and contract works insurance.
The Renovation Process
A typical home renovation follows these stages: initial consultation and design, council consent application (if required — allow 20 working days for processing), demolition and site preparation, structural work and framing, services rough-in (plumbing, electrical, gas), insulation and wall linings, fit-out and finishing, and council inspections and Code Compliance Certificate. For larger renovations, expect the process to take three to six months from consent to completion.
Tips for a Successful Renovation
Set a contingency budget of 15 to 20 percent — renovations commonly uncover hidden issues like rot, asbestos, or non-compliant previous work. Get a written contract before any work begins. For residential work over $30,000, a written contract is required by law. If you are living in the home during renovations, discuss a realistic timeline with your builder and plan for noise, dust, and disruption. Consider a pre-renovation building inspection to identify potential issues before you commit to a budget.
Renovation Builders in Wellington — FAQ
Renovation costs in Wellington typically range from $1,500 to $3,500 per square metre depending on the scope and finishes. A kitchen renovation costs $20,000 to $70,000, bathrooms $15,000 to $40,000. Get at least three quotes from builders to compare pricing for your specific project.
Renovation Builders Across Wellington
Our renovation builders cover all areas of Wellington including Te Aro, Thorndon, Kelburn, Karori, Brooklyn, Newtown, Island Bay, Miramar, Kilbirnie, Hataitai, and surrounding suburbs. No matter where you are in Wellington, we can connect you with a trusted local renovation builder.